Find Unlimited Emails.For Free.
Discover prospects, find their business emails, and build your pipeline with Unifers.
Start for FreeRahmat Basuki
Qa Qc Coordinator @PT Elnusa Tbk
Signup · Get unlimited contacts
WORK HISTORY
Qa Qc Coordinator @PT Elnusa Tbk
Jakarta, ID
EDUCATION
IKBAL M YOS
Welding Inspector
IKBAL M YOS
NDT MT-PT
Politechnic Surakarta
Mechanical Engineering
IKBAL M YOS
Radiography Interpreter
SKILLS
ABOUT RAHMAT BASUKI
More than Nine (9) years of construction experiences as STRUCTURAL/PIPING ENGINEER AND INSPECTOR,(NDE/Structural/Piping) and Welding Inspector (Integrated Deck, Jacket Sub-structure, Piping, Pipeline & Sub-sea, Pressure Vessel, Storage Tank and Hydro/ Pneumatic testing and setting-up of documentation for record tractability in Pressure Vessel, Storage Tank and Offshore Petroleum Industries in accordance to Quality System.) Also familiar with the international code requirement and application such as AWS D1.1, ANSI B31.1,ANSI B31.3, ASME, API 570, API 571, API 574, API 577, API 1104, API 578, ASTM, AISI, ABS, DNV, BS. Qualification ARRANGE PROCEDURE AND ENSURE ACTUALIZE WITH INSPECTIONS OF : 1. PURPOSE WPS 2. PROCEDURE QUALIFICATION RECORD 3. WELDING PROCEDURE SPECIFICATION 4. WELDER QUALIFICATION 5. INSPECTION TEST PLAN 6. ARRANGE NDT MT PROCEDURE 7. ARRANGE NDT PT PROCEDURE 8. ARRANGE NDT UT PROCEDURE 9. ARRANGE NDT RT PROCEDURE 10. VISUAL WELDING PROCEDURE ALL PROCEDUR DEPEND ACCORDANCE WITH - ASME - ASME IX - API 1104 - AWS D1.1 - ASTM 165 - ASTM 705 - ASME B 31.3 - API RP 2 A - ASME V - API 650 11. METALLURGICAL ANALYZE 12. HEAT TREATMENT 13. POST WELD HEAT TREATMENT 14. QUALITY MANAGEMENT SYSTEM ACCORDANCE ISO 9001 – 2008 15. QSHE 16. COORDINATION WITH CLIENT AND THIRD PARTY 17. WORKMANSHIP CONTROL 19. ARRANGE DAILY WORKING INSTRUCTION FOR MANPOWER 20. RECORD OF DAILY ACTIVITY AND DAILY PROGRESS RESULT
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.


