Find Unlimited Emails.For Free.

Discover prospects, find their business emails, and build your pipeline with Unifers.

Start for Free

Paul Staines

Senior Project Controls Consultant @Arcadis

Dublin, IE
MOBILE NUMBERS
+91 *********19

Signup · Get unlimited contacts

WORK HISTORY

Dec 2025 — Present

Senior Project Controls Consultant @Arcadis

Short term contract, managing the EPC (Exyte) on Schedule, Cost and Risk issues on 1.1 Billion euro European Semiconductor project.

EDUCATION

1977 — 1980

UCD

Bachelor of Engineering (B.Eng.), Electronics

N/A

University College Dublin

Electronics Engineering

N/A

SANDYMOUNT HIGH SCHOOL

LEAVING CERT

ABOUT PAUL STAINES

Experienced Project Controls expert with over thirty years experience in Project Cost, Risk and Schedule. PRINCE2 qualified. Tools:Schedule: ASTA, P6 Pro and OPC Cloud, MS Project, Schedule Reader plus Acumen Fuse. Claims:Forensica for FSA.Risk: Oracle PRA Risk (Monte Carlo).Program Controls: Oracle EPPM and Procore.Techniques:CPM, EVM, FSA, PRA Risk Analysis, Last Planner, TAKT, Pull Planning, LoB and Critical Chain.Languages:Fluent German.Technical French.Beginner Spanish.Experience:1. Semiconductors:Project Controls Magager for GF on 1.1 billion expansion project in Dresden. Planner for Intel on Fab 34.2. Data Centres:Senior Planner for 800 Million euro, 30MW Data Centre in Norway. Part of a 3 Billion Hyperscale DC Program for TikTok. Pharma: a. GSK Tech Transfer Biologics Project.b. 350 M euro Pharma plant in Switzerland. Created EPC and CQV schedules.c. 200 M euro Membrane factory with Merck.d. Lonza EPC Project.4. Utilities:1. 100M euro (Fixed price) upgrade of Treatment Plant in Dublin for IWB. Dealt with EoT claims due to weather, transport and Scope changes using FDA.5. Rail: 1. 4 Billion euro Project with Bombardier, Rapid Rail, India.2. 500 Million euro LRV Tram Project for STIB, Brussels. Level 1,2,3,and 4 schedules. Power Plants / Oil and Gas:a. Two Peaker Plants x 100 MW using 5 x 20 MW MAN Engines.b. Peaker Plant using 3 x 50 MW GE Generators.c. Introduced a MarkVIe Control system in Gas Plant d. Eskom: South Africa.100 day General Outage for 680 MW Power Station in Jo\'burg.(400 Resources).7. Mining / Manufacturing: Caterpillar: NPI projects, including the CAT 6060 Shovel, RH 55 Hard Rock Cutter (100 Million Euro project). PMO Lead in two of Caterpillar\'s German factories.8. Nuclear:Created a P6 fragnet for construction of a Cooling Pool (SFP) for Babcock on Wylfa Nuclear Plant in Wales. Telecoms:Project Manager on Fixed, Mobile 2G and 3G, plus LTE Networks.NMC/ OMC Lead for Huawei on LTE Rollout.10.PMO:PMO Lead Caterpillar, Germany.11. Claims: a. Consultant on quality of program schedules,contracts and EoT issues at Medupi Plant. Carried out FSA using Acumen Fuse and P6. The Plant comprised six boilers, each valued at 1.2 Billion euros.b. NCH Dublin. FSA of P6 plans and advisor on FIDIC, NEC and EPC Contracts, EoT claims and LDs.c: Bord Gais. Contract Management for GNI Fixed Price contract incl. LDs. EPC Tender appraisal and GAMA EoTs.

This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.