Unlimited Email and Phone number
Everything you need to reach more inboxes and close more deals
Unlimited Contact Only at$79
George Adamopoulos
Tbm Production Engineer - Tbm Epb 9 52m, Herrenknecht @AVAX GROUP
Signup · Get unlimited contacts
WORK HISTORY
Tbm Production Engineer - Tbm Epb 9 52m, Herrenknecht @AVAX GROUP
Athens, GR
Athens metro line 4, Section A forms part of the scheduled to be implemented in the long run overall Project of Line 4. The length of this section is approximately 12.8 km and it additionally includes the connecting tunnel of Line 4 with Lines 2 and 3, as well as the access tunnel to the train stabling and maintenance yard at Katehaki. The Project is made up of fifteen (15) underground stations and nine (9) intermediate and/or terminal shafts.
EDUCATION
University of Nicosia
Master in Business Administration - MBA, School of Business (top 6% of Business Schools worldwide)
National Technical University of Athens
PhD Candidate, Automation of mechanized tunneling method with TBM Epb using Artificial intelligence.
National Technical University of Athens
Master Diploma in Mining Engineering - MEng, Tunnels-Mines
ABOUT GEORGE ADAMOPOULOS
Master Dipl. Mining Engineer - N.T.U.A (20••••11). Master in Business Administration…
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.



