Get your Emails warmed up and ready to send

Build sender reputation and reach more inboxes with automated email warmup.

Warm up your emails

Starting at $49/month

Start Warming Up

Richard Herweynen

Technical Director, Water @Entura

Hobart, AU
MOBILE NUMBERS
+91 *********19

Signup · Get unlimited contacts

WORK HISTORY

Dec 2022 — Present

Technical Director, Water @Entura

Hobart, AU

Member of the Entura\'s Executive Team and recognised by peers as Entura’s final authority in this technical field and leading the technical direction within and across Group portfolios for organisational, client and project success. Undertaking the Project Director role on a number of key projects and providing strong Technical Governance on internal and external projects.Tarraleah Re-Development Project and Cethana PHES Project, as part of the BotN initiative - Technical Director and Chair Technical Working Group Baleh Hydropower Project (1285MW, 188m high CFRD)- Chairman of the Independent Review Panel (Malaysia).Murchison Dam Spillway Upgrade - Independent Reviewer (Tasmania).Independent Review on a number of Dam Safety Reviews that Hydro Tasmania is undertaking with external consultants - Murchison Dam, Mackintosh Dam, Tullabardine Dam, Trevalyn Dam, Bastyan Dam.Independent Review Role for Kidston PSP, particularly associated with Wises Dam.

EDUCATION

1995 — 1998

Deakin University

Graduate Diploma of Management (Technology Management)

1980 — 1981

Donvale Christian College

Grade 7

1973 — 1979

Calvin Christian School

Primary School

2010 — 2014

UNSW Australia

Master’s Degree

1981 — 1985

Ukarumpa High School

Grade 8 to Grade 12

1986 — 1989

University of Tasmania

Bachelor of Engineering (BE)

SKILLS

TunnelsTidal PowerEnergyProject ManagementRoadMini HydroHydraulicsWater ManagementWaterConstructionHydropowerWater Resource ManagementFeasibility StudiesEngineeringHydraulic StructuresWater ResourcesWater SupplyPower GenerationDamsCivil EngineeringConcrete

ABOUT RICHARD HERWEYNEN

I am seen as a trusted technical advisor to our Clients, and a leader in the hydropower and dams industry, both Nationally, as well as internationally. With over 30 years in the Hydropower and Water Infrastructure consulting industry, I believe I have the knowledge and experience to help you.My main areas of expertise are in dams, hydropower and more recently hydro pumped storage. My work has been predominantly in the Asia / Pacific Region having undertaken work in India, Nepal, China, Laos, Malaysia, Philippines, Korea, Papua New Guinea, Solomon Islands, Fiji and Samoa.My experience in Concrete Faced Rockfill Dams (CFRD) and Roller Compacted Concrete (RCC) dams, two of the most popular dams being constructed internationally, is well recognised in the industry. I have had lead design roles on the following dams: Nagmati Dam (CFRD), Wyaralong Dam (RCC), Meander Dam (RCC), Burnett River Dam (RCC) and Anthony Dam (CFRD). Recent international RCC experience was a review role at Murum Dam (141m high), during construction, first filling and initial operation, for the Ministry of Public Utilities, Sarawak; and am currently the Chairperson for the Independent Review Panel for the Baleh HEP in Malaysia, which includes a 188m high CFRD.I have had extensive experience in the hydropower sector in India, especially during the initial 3 years of Entura setting up its office in Delhi. I have undertaken detailed hydropower feasibility studies in Papua New Guinea and Malaysia. Recent hydropower experience has been around hydro pumped storage, with the detailed feasibility study and preliminary design for the Kidston Pumped Storage in north Queensland, where I continue to be an advisor to the Client during the construction of this project. I am also currently the Chair of the Technical Working Group and Technical Director for the Tarraleah Re-Development Project. I was also had a review role in the Sihwa Tidal Power Project (260MW) in South Korea.I am active with both the Australian National Committee on Large Dams (ANCOLD) and International Committee on Large Dams (ICOLD). I was part of the ANCOLD working group which updated the concrete gravity dam guidelines, and have Chaired one of the ICOLD technical committees.

This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.