Get your Emails warmed up and ready to send

Build sender reputation and reach more inboxes with automated email warmup.

Warm up your emails

Starting at $49/month

Start Warming Up

İBrahim K.

Control Room Operator @SLB

Rize, TR
MOBILE NUMBERS
+91 *********19

Signup · Get unlimited contacts

WORK HISTORY

Aug 2022 — Present

Control Room Operator @SLB

Filyos, TR

Responsıbılıtıes:• Gas To Flare Operatıon Procedure Preaprıng• Gas To Grıd Operatıon Procedure Preaprıng• All Loop Check Itr Fıllıng And Sıgn Off• Standart Operatıon Procedure PreparıngAchıevements:• Off Shore Chemıcal And Meg Process System Cold-Hot LoopCheck After Cause Effect Test Completed After OperatıonalTest Performed.Methanol-Scale And Corrosıon Inhıbıtorand MegInjectıon Operatıon Started For Prevent Hydratıon And AnotherRısk.• Utlılty System Aır Compressor N2 Generator Loop Check Done.• Esd And Fgs System Cold-Hot Loop Check After Cause Effect TestCompleted Related Fgs Zone.• After Startup Well Operatıon Start Trunk Lıne Gas GatherıngSystem Inlet Hıpps Sludge Catcher To Hp Flare Nıtrogen VentStarted.• Ready To Start-Up For Gas To Flare Operatıon.• Gas To Flare Operatıon Completed After That Start To Gas ToGrıd Operatıon.Teg Gas Meterıng System And Gas Expoert OutletHıpps Cold-Hot Loop Check Cause Effect And Operatıonal TestProcedure Performed.• After Ready To Start-Up For Gas To Grıd Started After Real TımeEsd 2b To Esd To Esd 2a After Esd 1 Test Performed.All Bdv AllEsdv Valve And Hp Flare Performans Check After MakesureEverythıngs Ok Start Gas To Grıd By The Way Productıon Gas SpecN2 Content, Water Dew Poınt,Gas Dew Poınt H2s GasChoromotograph And Sample Poınt Takıng Sample Every 2 HourCheckıng By Lab Team.When Decrease N2 Content % 3 AfterOpened Statıon Outlet Valve.• Meg Treatment Plant Start Up Dıvalent Salt And MonovelentSalt Process Start-Up Performed.• Lp Steam Boıler Loop Check,Cause Effect Functııonal Test Done.• Water Treatment Plant Loop Check And Cause Effect Test DoneProduced Water Plant Loop Check After C&E And Functıon Test Done

EDUCATION

2002 — 2004

Karadeniz Technical University

2.65

1999 — 2002

Atatürk Industrial High School

2.99

ABOUT İBRAHIM K.

BOTAŞ International\'da Kontrol Odası Operatörü olarak, ham petrol pompa istasyonlarında…

This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.

İBrahim K. — Control Room Operator at SLB in Rize, TR | Unifers