Project Manager @Enbridge
Calgary, AB, CA
Completed 27 km NPS 36 loop of high pressure Main Gas Pipeline. The project was put in service on time and without lost time or recordable incident during construction. The construction was in a very challenging area south west of town of Chetwynd including two HDD Pine River crossings (1866 m and 764 m length), incised creek crossings and steep side slopes. Managing brownfield project at Station 1 near town of Taylor, app. 20km south east of Fort St. John. The project scope is to add two Taurus 70 turbo compressors with aerial coolers, inlet scrubber, fuel gas skid, MCC and instrument air building and auxiliaries - yard piping, main gas valves and recycle valves - cold and surge protection. Scope also includes re-wheeling and aerial cooler addition to the existing turbo compressor package. In order to avoid outage at McMahon project will execute 13 hot taps on various sour and sweet pipelines within the facility. Scheduled In-Service is Q3 2019.
SKILLS
ABOUT ZELJKO AUBRECHT
Experienced senior project manager with leadership skills to build, guide and motivate…
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.