Trino Gutierrez

Staff Pipeline & Terminal Project Engineer @ Valero | Mechanical Engineering

Role
Staff Pipeline & Terminal Project Engineer at Valero
Location
Houston, TX, US
LinkedIn followers
500 followers

About Trino Gutierrez

With over two decades of experience in the oil and gas sector, I work as a Staff Pipeline…

Experience

  1. Staff Pipeline & Terminal Project Engineer

    Valero

    Mar 2023 — Present · US

    Responsible and full knowledge on the following items:• Contract and SOW• Requirements that are to be comply per client specifications and procedures• Change of management procedures• Schedule and Milestones• Based deliverable list• Weekly-Monthly Reports• Action Item List• Design freeze dates• Deliverables per discipline per milestoneControl sub-contractors (i.e, Geotech, Survey, Environmental, etc.) following same steps listed above.Report to client and management:• Cost• Forecast• Engineering and Design Lessons Learns• Engineering and Design Value Engineering Ideas• Resources requirements thru manpower loading plan• Issues Concerns• Change Order Log• Engineering Design progress per deliverable list and issuance status• Weekly-Monthly Reports• Procurement status as follows:o Material requisitionso Bid cycleo Technical bid evaluationo Commercial bid evaluationo Purchase order recommendation• Materials management status as follows:o Vendor data expediting per purchase ordero Expediting of equipmentSuccessful completed project in Mexico Tamaulipas of a new Storage Terminal will have a capacity of BBL:• (3) Regular Gasoline Storage Tanks of BBL.• Premium BBL Gasoline Storage Tank.• Diesel Storage Tanks, one of BBL and one of BBL.• MTBE Storage Tank of BBL.• Transmix Storage Tank of 1,200 BBL.• 1 Vapor Recovery System. Tag: 10-PK-001• 1 Water/oil collection and separation System. Tag: 10-PK-002• 1 Skid of 5-position tank filling skid, includes load arms (3 gasoline arms & 2 Diesel arms) at 600 GPM. With 1 dedicated pump for Transmix.• 1 Skid of 5-position tank filling skid, includes load arms (3 gasoline arms & 2 Diesel arms) at 600 GPM.• Rail loading system – 13 racks for 26 carts (600 GPM) – 13 rack x 4products (52 arms).• Firefighting water system. Includes (2) GPM fire water pumpsand a Jockey pump.

Education

  • Universidad Naciona Experimental del Tachira - Venezuela

    Bachelor's degree, Mechanical Engineering

    1996 — 2003

Find verified contacts for anyone on LinkedIn

Unifers gives sales teams verified emails and direct dials, enriched profiles, and outreach that lands in the inbox.

Free plan included · No credit card required

This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.

Trino Gutierrez — Staff Pipeline & Terminal Project Engineer at Valero in Houston, TX, US | Unifers