Timothy Dizon
Electrical Project Engineer @Five Star Electric Corp.
Signup · Get unlimited contacts
WORK HISTORY
Electrical Project Engineer @Five Star Electric Corp.
Passaic Valley Sewerage Commission (May 2022 - Present)\\\\nContract A939A – Plant Wide Replacement of Electrical Cables & Utility Tunnel Bulkheads. Project includes plant wide replacement of existing electrical/communication cables and cable trays within the utility tunnel, installation of new tunnel bulkheads, restoration and repair of existing utility tunnel, HVAC improvements, and removal of the temporary above ground power distribution system.\\\\n\\\\n• Newark Terminal A Redevelopment (Apr 2019 - Jan 2023)\\\\nUnder Port Authority of New York and New Jersey, construction of a new $2.7 billion, 33-gate terminal building, including N60 frontage road and pedestrian bridge. Scope of work includes power distribution, communications, airport systems, security, lighting & lighting control, fire alarm, and wireless systems.\\\\n\\\\n• 425 Park Ave (Jun 2017 - Aug 2020)\\\\nCore & shell construction of a 41-story, 900-foot tall new frame/concrete core commercial building located in Park Avenue, Manhattan. Scope of work included [4] incoming electrical utility service & associated switchgear,[2] parallel 2.8MW generators,[14] new automatic transfer switch (ATS) units, & busduct distribution system, general power, lighting control, fire alarm, and telecommunications.\\\\n \\\\n\\\\n \\\\n \\\\n\\\\n \\\\n
SKILLS
ABOUT TIMOTHY DIZON
Electrical Project Engineer at Five Star Electric Corp.
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.