the Priyanshu Gandhi

Engineer @Dywidag Bridgecon

Kollam, KL, IN
MOBILE NUMBERS
+91 *********19

Signup · Get unlimited contacts

WORK HISTORY

Dec 2025 — Present

Engineer @Dywidag Bridgecon

View department →

Project : Perumon Cable Stay Bridge Project OWNER : Kerala Road Fund Board, KRFB KeralaCONTRACTOR : CVCC#Work Details-Stay Cable Bridge of H Shaped 2 Pylon (Assembling, Installation, Stressing & Finishing) Pair of 5+5 nos of Stay Cable.#Stressing -• Post-Stressing by 15.7 Dia with Galvanised PE Coated, LRPC CLASS-2 Strands.#Structure Elements-• Cast in situ Upper Pylon.• Concrete deck cast in situ slab connection Bridge.CSB Length - 154 m.#Work Scope-• Stressing With Stay Cable Anchorage Type DGP-19.

EDUCATION

N/A

National institute of interior designing Guwahati

Interior Designing Mastery, Architectural Engineering

N/A

LNCT Group of Colleges

Master of Technology - MTech, Structural Engineering

N/A

Rajiv Gandhi Prodyogiki Vishwavidyalaya

B.Tech/ M.Tech, Civil Engineering

N/A

The Haryana State Board of Technical Education (HSBTE)

Diploma, Civil Engineering

N/A

NRI Group of Institute

B.Tech, Civil Engineering

ABOUT THE PRIYANSHU GANDHI

Execution of Stay Cable/ Extradosed Bridge With Type DGP-19, DGP-31, DGP-37, DGP-73, DGP-91 of MetroRail, Railways, Various State PWD and NHAI.Joined PTi - Post Tensioning Institute as a Student Member for a Strong Technical Community.Professionally Graduated :• Diploma in Civil Engineering • B.Tech in Civil Engineering. • Pursuing M.Tech in Structural Engineering.

This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.

the Priyanshu Gandhi — Engineer at Dywidag Bridgecon in Kollam, KL, IN | Unifers