Tec Sorin

Construction Manager @Bteam Limited

Exeter, GB
MOBILE NUMBERS
+91 *********19

Signup · Get unlimited contacts

WORK HISTORY

Aug 2020 — Present

Construction Manager @Bteam Limited

View department →

London, GB

ground improvement and compaction techniques : Vibro-compaction, Vacuum consolidation, Preloading Vibro-replacement stone columns and general grouting to improve the bearing capacity of soil, remove pore water, before any build of construction elements start as: foundations, retaining structures, sloping walls, dams, bridges etc. seismic loading is suited for constructions structures especially in seismically active regions._ reinforced concrete mega power dams with spillways, slots, hydropower inlets, tunnels for operation and transmission, overflow crests, penstocks and surge chambers, admission pipelines system, cofferdams and reinforced concrete plugs, power station, hydropower system shuttles, overflow drainage with chutes in the waterway.

EDUCATION

1991 — 2006

Polytechnical Construction School - Romania

Construction Site Manager, Reinforced Concret3 Structure Resistance, Covstruction Manager - Structure Resistance

1983 — 1987

High School - Construction Trades Engineering & Architecture

Construction Supervisor, Construction Engineering Technologies, Site Supervisor

ABOUT TEC SORIN

ground improvement and compaction techniques : Vibro-compaction, Vacuum consolidation, Preloading Vibro-replacement stone columns and general grouting to improve the bearing capacity of soil, remove underground pore water before any construction of various structures elements start as foundations, retaining structures, sloping walls, hydropower dams, bridges etc. seismic loading suited for construction especially in seismically active regions._ reinforced concrete mega power dams with spillways, slots, hydropower inlets, tunnels for operation and transmission, overflow crests, penstocks and surge chambers, admission pipelines system, cofferdams and reinforced concrete plugs, power station, hydropower system shuttles, overflow drainage with chutes in the waterway._ advanced know-logy of using industrial shutterings climbing system : RMD, Topec,Harsco, Hunnebek, Doka, Perri, Kometa, K-form, Topmax, Alsina, Skydek, and all types of wood and plywood formworks._steelwork, steel erection, reinforcement, concrete work, footing excavation and general grading, precast elements casting, cast in situ concrete works._ piling, Pile Foundations - Driven Precast Concrete Piles - Driven Cased, Cast In-situ Piles - Continuous Flight Auger Piles (Bored)- Vibro Piles and reinforced cages for pliers, precast and cast in situ reinforced concrete structures elements : foundations-basements,columns,beams, slabs, staircases, retaining walls, round, curved or elliptic walls, swimming pools, reinforced concrete highways roads and tunnels, all types of prestressed concrete bridges- complete Sheet Piles Quay walls with Capping Beams and Morning Bollards, Gabion Walls & Cages, Break Waters, Concrete Accropods Sea Defense Barriers, Rock Revetments, Caissons and Cofferdams, Berthing Dolphins, Dry Docks._ estimating and take off after drawings, reading and interpret all types blueprints and good HSE Coordinator prepare risk assessment, method statement, scope of work and sequences worksheets.

This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.

Tec Sorin — Construction Manager at Bteam Limited in Exeter, GB | Unifers