Simon Perona
Principal Electrical Engineer @Wood
Signup · Get unlimited contacts
WORK HISTORY
Principal Electrical Engineer @Wood
GB
Responsible for the conceptual electrical system design and equipment specification for the site wide Power System Automation (PSA), Power Management System (PMS) and Condition Monitoring System (CMS) for the Al-Hada Gas Plant. The electrical supply network for the Plant is made up of one (1) 230kV GIS Substation and fourteen (14) Distribution Substations housing a combination of 13.8kV, 4.16kV and 480V distribution and control equipment.
EDUCATION
Thames Valley University
BSc (Hons)
Reading College
HND
Newbury College
City & Guilds 236 Pt 1, 2 & C
ABOUT SIMON PERONA
A Chartered Engineer with over 20 years’ experience in the Oil & Gas, Petrochemical and…
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.