Shridhar Patil

Section Engineer Survey K4 in Mml-12 @Systra India

Mumbai, MH, IN
MOBILE NUMBERS
+91 *********19

Signup · Get unlimited contacts

WORK HISTORY

May 2024 — Present

Section Engineer Survey K4 in Mml-12 @Systra India

View department →

Mumbai, IN

Kalyan to Taloja Metro Line-12 Alivated Total length of Project including depot approach line 23.57km.Responsibilities :GPS Pillar Establishment.GPS Observation.Total Station Traverse With Baudithch Method.Topography Survey instruments used (Total Station and DGPS).Level Flying and traverse work.Topography Verification on Ground along deputed agencies.Traverse Check with total station and Digital level for \'Z\' Value.GAD cross section plan verification and finalization work.Contractor Submitted Dwgs for any Structure coordinates and levels verification on GAD and On Site.Structure Coordinates and Levels verification as per approved drawing like a.PilePile capOpen Foundation Pier Starter and Every lift of Pier.Pier cap alignment checking.Pedestal and seismic arrestor checking.U-girder and Segmental span alignment levels checking.On Station location.CPC,PPC extension arm lift escalator checking.Entry Exit locations finalization andUtility diversion plan preparation.for Land.Land Plan Preparation with Tikka with Urban areas and Village Map with Rural areas.Area statement report Preparation.Coordinate with the land department of LARR MMRDA.

ABOUT SHRIDHAR PATIL

Civil Engineering professional with 10+ years of reach experience in Metro and Railway…

This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.

Shridhar Patil — Section Engineer Survey K4 in Mml-12 at Systra India in Mumbai, MH, IN | Unifers