Shaun Smith
Site Manager @Costain Group PLC
Signup · Get unlimited contacts
WORK HISTORY
Site Manager @Costain Group PLC
GB
Joined Costain as Senior Supervisor progressed to Site Manager on projects throughout UK and EuropePRESENT:Power Station outage Cottam CDC refurbishment 10 cell Cooling TowerNeatherlands 5 Cell Cooling Towers New BuildConnahs Quay,Refurbishment of 5 cell Cooling TowerExon Mobile, Fawley, Repair and Maintenance To Cooling Towers.Netherlands Extension Phase Twin Cell Cooling Tower, completion date 23.11.18Ironbridge Power Station, Site Manager Decommissioning Power Station, First Phase Cleaning all Plant, De watering Station. 20••••17 New Build single Cooling Towers x 9 Nordic RegionNew build 5:Cooling Towers Netherlands March 2015 to August.General repair and maintenance on Cooling Towers at various Power Stations Drax Power, Ratcliffe Power, Eggborough Power, Ferry bridge,Ironbridge, and KillingholmeOutage periods April 2008 to 2012 Stepped in as Construction Manager at Ratcliffe On Soar Powers Station Refurbishment project of eight Natural Draft Hyperbolic Cooling Towers.Site Manager on New Build 4 Cell Counterflow Cooling Tower at Tees Valley Energy form Waste 2013. phase 2 NovemberSHE Advisor at Fiddlers Ferry power station D1 and D2 Cooling tower Refurb 20••••13 to March 2015SHE Advisor, August to December 2015 Fiddlers Ferry Power Station, Cooling Tower Refurbishment
SKILLS
ABOUT SHAUN SMITH
Highly motivated individual,with a desire to achieve and to be successful.
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.