Sergio Bertolet

Project Director, Rail Baltica Riga Central Station - Management and Supervision of Design and Build @Egis

Birmingham, GB
MOBILE NUMBERS
+91 *********19

Signup · Get unlimited contacts

WORK HISTORY

Dec 2023 — Present

Project Director, Rail Baltica Riga Central Station - Management and Supervision of Design and Build @Egis

View department →

Riga, LV

Rail Baltica is a greenfield rail transport infrastructure project with a goal to integrate the Baltic States in the European rail network. The project includes five European Union countries – Poland, Lithuania, Latvia, Estonia and Finland.A new fast, conventional double-track electrified and ERTMS-equipped railway line with maximum design speed of 249 km/h (the maximum operational speed of 234 km/h) on the route from Tallinn through Pärnu – Rīga – Panevėžys – Kaunas to the Lithuanian-Polish border, with a connection from Kaunas to Vilnius. The new railway line will be designed with 1435 mm gauge thus confirming to all requirements of the Technical Specifications for Interoperability (TSIs).

EDUCATION

1991 — 2001

Universidad de Cantabria

Master of Science - MS, Civil Engineering

ABOUT SERGIO BERTOLET

Director of large, complex, multidisciplinary transport infrastructure…

This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.

Sergio Bertolet — Project Director, Rail Baltica Riga Central Station - Management and Supervision of Design and Build at Egis in Birmingham, GB | Unifers