Satish Gaikwad
High Speed Bullet | Metro | Marine | Bridges
- Role
- Senior Site Engineer Expert at Tata Consulting Engineers
- Location
- Mumbai, MH, IN
- LinkedIn followers
- 500 followers
About Satish Gaikwad
That\'s an impressive and diverse range of experience in the construction and…
Experience
Senior Site Engineer Expert
Aug 2023 — Present · IN
Bullet train high speed Rail (HSR)High-speed trains on Mumbai-Ahmedabad High-Speed Rail Corridor will operate at a speed of 320 Km/hr. covering 508 Km and 12 Stations. There will be 35 trains per day/one direction, with a frequency of 20 mins in peak hours and 30 mins in non-peak hours.The entire journey will be completed in about 2 hours 7 minutes with limited stops (at Surat, Vadodara, and Ahmedabad) and all stops service will take 2 hours 58 minutes. Operations Control Centre for MAHSR corridor will be located at Sabarmati.• Approximately 92% of the high-speed railway tack will be elevated through viaducts (as shown in the image) and bridges. Out of 508.09 KMs distance, 460.3 KMs (90.5%) will be viaduct, 9.22 KMs (1.8%) e on bridges, 25.87 KMs tunnels (including 7 KM long undersea tunnel) and 12.9 KMs (2.5%) will be on embankment/Cutting
Find verified contacts for anyone on LinkedIn
Unifers gives sales teams verified emails and direct dials, enriched profiles, and outreach that lands in the inbox.
Free plan included · No credit card required
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.