Rob Cussons

Project Director for Dogger Bank d @SSE Renewables

Glasgow, GB
MOBILE NUMBERS
+91 *********19

Signup · Get unlimited contacts

WORK HISTORY

Apr 2024 — Present

Project Director for Dogger Bank d @SSE Renewables

View department →

Glasgow, GB

Leading the development of Dogger Bank D, the fourth phase of the world\'s largest offshore wind farm in construction. Dogger Bank D is a 50/50 joint venture between SSE Renewables and Equinor, more details are available here: https://doggerbankd.com/.

EDUCATION

1999 — 2003

University of Leeds

MPhys, Physics with Astrophysics (European)

2002 — 2002

Aarhus University

Theoretical Nuclear Astrophysics

2005 — 2008

Technische Universität Darmstadt

Dr. rer. nat., Theoretical Nuclear Astrophysics

ABOUT ROB CUSSONS

I\'m absolutely driven by tackling climate change through the development of renewables projects. I\'ve been involved in the renewables industry for nearly two decades and currently I\'m fortunate to be leading a fantastic team in progressing the Dogger Bank D offshore wind farm through development.

This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.

Rob Cussons — Project Director for Dogger Bank d at SSE Renewables in Glasgow, GB | Unifers