Phillip Barry

Project Manager @Neilcott Construction Limited

London, GB
MOBILE NUMBERS
+91 *********19

Signup · Get unlimited contacts

WORK HISTORY

Feb 2020 — Present

Project Manager @Neilcott Construction Limited

View department →

Project Manager Nonsuch High School for Girls Fire Protection Upgrades Removal and replacement of Fire Alarm System covering the whole school campus Removal of all existing doors and replacement with New Fire Doors and associated fire stopping and decorations across the campusReplacement of campus internal roads resurfacing with new drainage Installation of new DDA compliant access ramps Upgrade of Emergency lighting and fire escape signageLeeson\'s Primary School flood defense and rainwater management project. Installation of new roads, land drains and bunds to redirect and control rainfall protecting the school from future flooding Abbey Primary School Fire Protection Upgrades Replacement of all doors to the schools with new fire doors and fire stopping Replacement of internal screen wall windows to fire protected walls/windows Installation of 5 new DDA ramps and entrances Redecoration of SchoolGlenthorne High School Fire Protection Upgrades Upgrade of all doors to fire doors across the school campus with associated fire stopping and decoration Replacement of existing fire alarms emergency lighting and fire escape signage Rainham Mark School Fire Protection Upgrades Upgrade of all doors to fire doors across the school campusInternational Society of Ultrasound in Obstetrics & GynecologyRebuild of flooded basement Requiring new walls, electrics, toilets, kitchen, board room, Air Conditioning and external flood defenses drainage and flood protection doors.St Johns Primary School Woking Replacement of all doors to Fire doorsOverclad of all internal non fire protected walls to improve fire protection New fire alarm, emergency lighting and escape signageMiddlesex Filter Beds Installation of a new water pumping station complete with its own on site electrical generation and new security enclosure Enabling the reinstatement of wetlands to the lee Valley Nature Reserve by taking water from the river lee

SKILLS

SafetyFinancial Retention ManagementContract ManagementConstructionRefurbishmentsDesign ManagementContractorsValue EngineeringConstruction ManagementCustomer ServiceRailBid PreparationFeasibility StudiesAftersalesCost EngineeringRefurbishingCustomer CareDefects ManagmentAftercareTender PreparationTeam LeadershipRefurbishmentCommunication SkillsProcurementSurveyingProject ControlTechnical PresentationsManage Client RelationshipsZero DefectsConstruction SafetyCost ControlSocial HousingProject BiddingProject ManagementFacilities ManagementCommercial ManagementClient LiaisonProblem Solving

ABOUT PHILLIP BARRY

Hi I’m looking for a new opportunity I have over 30 years’ experience…

This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.

Phillip Barry — Project Manager at Neilcott Construction Limited in London, GB | Unifers