Petri Lakrori
Project Engineer @DEGES Deutsche Einheit Fernstraßenplanungs- und -bau GmbH
Signup · Get unlimited contacts
WORK HISTORY
Project Engineer @DEGES Deutsche Einheit Fernstraßenplanungs- und -bau GmbH
Düsseldorf, DE
Since 2018 I have been working on the project “Replacement construction of the Duisburg Neuenkamp Rhine bridge including the 8-lane expansion of the section of the A40 between Duisburg-Homberg and Duisburg-Hafen”. The expansion length is approx. 4.5 km. The expansion section is characterized by the new Duisburg-Neuenkamp Rhine bridge with a length of 802 m. The span of the new bridge is 380 m, making it the cable-stayed bridge with the largest span in Germany. Construction began in June 2020. On November 6th, 2023, the southern part of the structure was put into operation and the first major milestone (6+0 traffic routing and decommissioning of the existing bridge) was reached. The second major milestone came in February 2025 with the successful completion of the dismantling of the 50-year-old Rhine bridge. The northern part of the structure is currently being built. The new bridge (south substructure in the end position after the transverse displacement and north substructure) will be completed by 2028. Further information about this project and the construction process so far can be found in our videos (see link below) and on our project page on the Internet:
EDUCATION
RWTH Aachen University
Master of Science (M.Sc.), Structural Engineering
SLV Duisburg
International Welding Engineer (IWE)
Petro Nini Luarasi
High School
RWTH Aachen University
Bachelor of Science (B.Sc.), Civil Engineering
RWTH Aachen University
Staatliches Studienkolleg für Ausländische Studierende der RWTH Aachen University
ABOUT PETRI LAKRORI
M.Sc. RWTH (IWE)
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.