Petar Malenica
Drilling Consultant @Iron Senergy
Signup · Get unlimited contacts
WORK HISTORY
Drilling Consultant @Iron Senergy
Waynesburg, PA, US
Supervise all critical operations including but not limited to, rig up/down, Bottom Hole Assembly (BHA), casing, cement, and ensuring safety and environmental policy compliance.Drill vertical CBM production well and ensure accurate fiberglass casing joint placement and cementing across coal seam.Drill deviated medium radius well and intercept production well at fiberglass joint in coal seam, then drill multi-lateral well to design over of combined lateral length (4 laterals, longest 7,372’ MD)Drill underbalanced utilizing compressed air injection down production well to lower ECD and minimize drilling induced formation damage.Coordinate logistics for safe efficient movement of equipment and material on-site.Lead all pre-tour, pre-job safety meetings ensuring safe efficient operations.
SKILLS
ABOUT PETAR MALENICA
Sr. Well Construction Supervisor
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.