Paul Kirchner

Study Manager @Aker Solutions

London, GB
MOBILE NUMBERS
+91 *********19

Signup · Get unlimited contacts

WORK HISTORY

Jan 2021 — Present

Study Manager @Aker Solutions

View department →

Tender and project management including consulting on onshore and offshore decarbonisation studies, including carbon capture, hydrogen, electrification, energy efficiency and emissions reduction.

EDUCATION

1993 — 1997

University of Surrey

Bachelor of Engineering - BEng, Environmental Chemical Engineering

SKILLS

HazopGasPetroleumP&IdUpstreamProject EngineeringPetrochemicalPipingOil & GasLngAspen HysysEpcFeedRefineryOil/GasOilOilGas Processing

ABOUT PAUL KIRCHNER

Energy professional passionate about and experienced in optimising and decarbonising design solutions. Extensive insight into decarbonisation of the oil and gas industry including carbon capture. Experience includes engineering design and management in over 10 amine plant designs from concept through FEED to Detailed Engineering.Competencies:• Feasibility• Optimisation• Decarbonisation• Concept• FEED• Detailed Engineering• Oil• Gas Processing• Petrochemical• Refining• Greenfield• Brownfield• Onshore• Offshore• Modularisation• Process Engineering• Engineering Management• Project Management• Proposal Management• Customer Engagement• Technology selection• Technology Assurance• IntegrationProven track record of winning (client engagement, proposal development, contract management and negotiation) and managing multiple projects simultaneously and managing multidiscipline teams to ensure on-time, on-budget and meeting client’s expectations.Experienced in developing strategies, coaching /mentoring individuals, presenting, oversight and due diligence, technology selection, framing, driver selection and risk identification/mitigation, problem solving/optimisation including brainstorming and scenario development and analysis.Key Achievements:• Consulting on blue hydrogen development in North America.• Onshore/offshore decarbonisation study manger for Repsol - electrification, emissions reduction and energy efficiency.• Consulting on CO2 EOR and storage Project offshore for Wintershall.• Led, win and execution Tullow’s Jubilee Seawater Project• International member of Aker Solutions’ Decarbonisation Team• BP’s Clair South Project - supported winning of project through value engineering of original design focused on decarbonisation and supported delivery through options analysis• Supported winning of Shell’s LNGC carbon capture project• Responsible for delivering decarbonisation of LNG facilities Project including carbon capture• Responsible for win and execution of BP’s Phase 2 and 3 Tortue electrification study• Supported winning of Fluxys’ carbon capture frame agreement• Managed proposal to win Repsol’s front end frame agreement• Various roles in Equinor’s Johan Sverdrup electrification development• BP H2S Management Project - gas treatment technology including new technology development • Sulphur Recovery - part of technology team. Selling, developing and executing technology based solutions.

This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.

Paul Kirchner — Study Manager at Aker Solutions in London, GB | Unifers