Monitor/supervise/inspect Monopile completion activities• Participate in the supplier\'s inspection and test activities• Follow-up on manufacturing progress• Report non-conformities and observations.• Monitor production activities and production documentation as spot checks• Monitor product quality and participate in FAI/FAT activities• Report non-conformities detected during inspection and test and manufacturing• Report relevant quality issues• Follow-up on condition and maintenance at supplier\'s storage area• Follow-up on manufacturing progress according to agreed project manufacturing schedule• Support in coordination, installation and random check of Employer’s Deliveries• Keep track of trend concerning repeated non-conformities and manufacturing errors and follow-up with the supplier concerning corrective and preventive actions• Verify quality criteria applied by the supplier in manufacturing• Documentation of daily work and inspections to WTG Fabrication & Quality Manager• Prioritise participation in inspection and test activities for different components according to failure trends and criticality of failures• Review quality related as-built documentation• Highlight HSE related issues where relevant
EDUCATION
University of Lincoln
BS
University of Lincoln
Bsc, Engineering Management
Brierton Community School
High School
Teesside University
Higher National Diploma HND, Project Management
HCFE Hartlepool Collage of Further Education
NVQ 3, Engineering
Teesside University
Higher National Certificate HNC, Engineering
SKILLS
ABOUT PAUL WHITESIDE
Experienced Manager with the ability to lead and manage teams effectively, ensuring projects are delivered, safely, on time, within specification, to a high standard and within budget.My experience in leading large multidiscipline teams enables me to deliver complex projects from award to delivery ensuring the project standards and specifications are adhered to while maintaining a high level of safety. Throughout all aspects of my work I adopt a proactive attitude and excellent communication skills. Within my previous employment I was involved in Welding Inspection, Fabrication, Engineering and management of structures in the oil and gas and renewable sector. This includes the fabrication and inspection of over 400 transition pieces (TP’s) and Monopiles, including secondary steel for the offshore wind industry. I am willing to travel overseas and able to work flexible hours to fulfill the requirements of the project. Currently a Belgian resident and hold a valid Frontier card allowing work in the Netherlands until 2029. Current Project:Ørsted - Hornsea 03, Monopiles and SIP fabrication. Previous ProjectsSSE Renewables – Doggerbank Offshore Wind Farm A, B&C - 277 Transition Pieces. Ørsted / EEW SPC GmbH – Hornsea 02 (30 TP’s)Ørsted / EEW SPC GmbH – Borssele (35 TP’s)Ørsted / EEW SPC GmbH - Hornsea 01 extension (30 TP’s)Ørsted / EEW SPC GmbH – Hornsea 01 Extension Offshore Wind Farm project (56 TP’s)DONG Energy - Walney Extension Offshore Wind Farm (40 TP\'s)Petrofac - Galloper Substation PlatformMaersk - Culzean Wellhead Platform jacket, wellhead access deck and access waysConoco Philips - Britannia LTC ModuleDong Energy - Siri Permanent SupportsSaipem - Pipelay Vessel J-Lay TowerSaipem - Jacket Lifting FrameSaipem - Hejre DevelopmentMarine Fabrications - Flexible Pipe/Umbilical CarouselsSubsea 7 - TowheadsAker Solutions - Flyndre Cawdor MSFETechnip - Ridgid JumpersKonsberg - Valhall SAT FrameBibby Offshore - MWA SB