Paul Cozens
Project Planner @WSP
Signup · Get unlimited contacts
WORK HISTORY
Project Planner @WSP
TfGM / Metrolink Renewals & Enhancement Programme:(Dec21 to Present)- Project Planner working on their Future Works Programme (Multi-disciplinary)• NR Telecoms / Migration + Telecoms Design:(Dec’13 to Dec 21)- Programme Planner with Network Rail Telecoms. • NR / Lead Design Organisation / Great Western Electrification Prog,(Oct’13 to Dec’13): • NR / Electrification & Plant Design Group, – Route Section Design for Great Western Electrification Prog.(Sep’13 to Oct’13):• Parliamentary Estates Directorate / Houses of Parliament (Aug’13 to Oct’13)- Fire Safety Improvement Works,(FSIW)• BAA / Heathrow T2B – SCADA/RTU + Sump Panel Install.(Jun’13 to Sep’13): • BAA / Heathrow T2B – Metering Install Connection Project.(Jun’13 to Sep’13): • NR / Midland Mainline, Level 0 interface.(Mar’13 to Jun’13)• BAA / Heathrow T2B – ICS Design Packages up to Design ‘Stage P4’.(Feb’12 to May’13): • NR, National Traffic Management Project:(Oct ’12 to Oct ’13). • Signalling Solutions, Network Rail / North Lincolnshire Re-Sig:(Aug’12 to May‘13). • Parliamentary Estates Directorate / Houses of Parliament (Jun’12 to Oct’12) • Dungeness ‘B’ / BB WorkPlace for EDF Energy:(Feb’12 to Apr’12). Dungeness DNB 92\' Walkway Strengthening.• NR, Thameslink / N401 Depot Stabling GRIP 3 & 4 (Aug’11 to Nov’12): • NR, CrossRail / Chadwell Heath Turnback & Platform Ext GRIP 4 (Dec’10 to Jun’11): • NR, CrossRail / Chadwell Heath Goods Loop GRIP 4 (Jun’10 to Mar’11): • NR, Thameslink / Three Bridges New Substation GRIP 4 (Feb’11 to Sep’11): • NR, Thameslink / Three Bridges & Hornsey GRIP 4 (Apr’10 to Sep’11): • NR, Thameslink / N400 Phase 1 - TLK / ELL Interface at Bridge 89B (Jan’10 to Apr’10): • NR, National Station Improvement Prog / GRIP 3 Projects (Jul’09 to Jan’10): • East London Line / Phase 2 – GRIP 4 (May’09 to Aug’09): • NR, Thameslink / Immunisation Project (Feb’09 to Jan’10):
SKILLS
ABOUT PAUL COZENS
Production and management of Work Breakdown StructuresDevelopment and implementation of Project specific activity & milestone coding.Development and update of logic relationships between activitiesBuilding and cost / resource loading tender programmes in MSP (Microsoft Project) Software for later export into Primavera.Cost loading of schedule activities for baseline agreement.Resource loading of plans as per project remitsPeriodic updating and reporting on volumes, cost, milestones and forecast spendDevelopment and analysis of varied reports to fit project team requirementsReporting on milestone events and critical path issues to Project Controls.Development of project plansSpecialties: Primavera P6Railway PrinciplesGRIP Trained (Guide To Railway Infrastructure Projects)
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.