Pala Durgareddy
--L&T Construction, TIIC
- Role
- Planning Engineer at L&T Construction
- Location
- Hyderabad, TG, IN
- LinkedIn followers
- 500 followers
About Pala Durgareddy
Planning & Project Coordination Engineer with ~3.5 +years of experience. Skilled in…
Experience
Planning Engineer
Mar 2024 — Present · Surat, IN
Senior Engineer in Planning cell at Mumbai – Ahmedabad High-Speed Rail EW-1 (MAHSR Bullet Train) project which is a 508.17 km under construction High Speed Rail line that will connect Mumbai, Maharashtra with Ahmedabad, Gujarat through 12 stations.Type: Elevated, Underground & At-GradeDepots: Sabarmati Rail Depot, Surat Rail Depot and Thane Rail DepotStation Names: Mumbai (Bandra Kurla Complex), Thane, Virar, Boisar, Vapi, Bilimora, Surat, Bharuch, Vadodara, Anand/Nadiad, Ahmedabad, and Sabarmati
Education
Jawaharlal Nehru Technological University
Bachelor of Technology - BTech
2018
Find verified contacts for anyone on LinkedIn
Unifers gives sales teams verified emails and direct dials, enriched profiles, and outreach that lands in the inbox.
Free plan included · No credit card required
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.