Mohan Muniappan

Electrical Power System Planning, Design & Studies Expert

Role
Associate Engineer Ii - Power System Planning & Studies at Electrical Consultants, Inc.
Location
Chesapeake, VA, US
LinkedIn followers
500 followers

About Mohan Muniappan

Electrical Power System Planning, Design & Studies Expert

Experience

  1. Associate Engineer Ii - Power System Planning & Studies

    Electrical Consultants, Inc.

    Dec 2024 — Present · Chesapeake, VA, US

    Currently, I am working as an Associate Engineer-II in power system planning & studies. Here, I am involved in system planning, design & studies for the substations, transmission lines & renewable energy system projects.Projects Working:1. AC & DC Short Circuit study: • 230 kV Beehive Substation connecting BESS in Arizona, USA. • Calisto BESS (SMA 3950-UP-US) in Texas, USA. • Siemens MW, ±525 kV VSC-HVDC project from Wyoming to Utah station, USA.2. Harmonic study: • 345 kV Monte Cristo substation connecting BESS in Texas, USA.3. Development of a 36 MVAR capacitor bank-controller model in PSCAD for the Milagro substation connecting Solar and BESS in New Mexico, USA.4. Temporary Overvoltage (TOV) study: • 525 kV Easley Substation connecting Solar & BESS in California, USA. • 345 kV Lumina-II substation connecting BESS in Texas, USA. • 345 kV Quantum I & II Substation connecting Solar & BESS in Texas, USA.5. Switching and Lightning Overvoltage study: • 345 kV Sierra Substation connecting Solar system in Nevada and California, USA. • 500 kV Hashknife substation connecting Solar & BESS in Arizona, USA. • 115 kV Canisteo Substation connecting wind farms in New York, USA. • 138 kV Bobcat Bluff substation connecting BESS & wind farms in Texas, USA. • 345 kV Lake Trout Substation connecting solar system in Indiana, USA. Transient Recovery Voltage (TRV) study: • 69 kV Great Bend Solar Substation connected to Granny Run Substation in Ohio, USA.7. Cable Transient Overvoltage study (TOV, Switching, Faults studies): • 138 kV Underground cable connected between Longhorn Crypto Capital 5 (LCC5) & Long Draw II substations in Texas, USA. • 69 kV Underground cable connected between LCC5 & Henshaw/Hoops Substations in Arizona, USA.

Education

  • Cornell University

    Engineering Leadership, Business Administration and Management, General

  • Christian College of Engineering and Technology, Oddanchatram, Palani

    Bachelor of Engineering (B.E.), Electrical and Electronics

  • Thiagarajar College of Engineering

    Master of Engineering (M.Eng.), Power Systems

  • National Institute of Technology Karnataka

    Ph.D., Electrical Power Engineering

Find verified contacts for anyone on LinkedIn

Unifers gives sales teams verified emails and direct dials, enriched profiles, and outreach that lands in the inbox.

Free plan included · No credit card required

This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.

Mohan Muniappan — Associate Engineer Ii - Power System Planning & Studies at Electrical Consultants, Inc. in Chesapeake, VA, US | Unifers