Simon Midy
Well Performance Engineer @Perenco
Signup · Get unlimited contacts
WORK HISTORY
Well Performance Engineer @Perenco
Ville de Paris, FR
Site monitoring: 20 operating wells and 10 control wells- Calculation of withdrawal performance for a campaign according to different stress scenarios- Daily monitoring of control wells (changes in the height of the water/gas interface, recovery of neutron logs to check for the presence of gas, etc.)- Taking part in meetings on well recovery projects- Drawing up weekly flow rate instructions for operating wells.Monitoring water production from operating wells- Simulation of water production from production wells over 15 days- Analysis of site and simulated data to support operations in the treatment of produced water. Study of the silting up of wells: Verification of the silting up values of the well strainers in order to prevent the need for spooning operations to free up the height of the strainers. Study of a site\'s compressor fleet: analysis of compressor data (suction pressure, discharge pressure and compression ratio as a function of flow rates) in order to construct a mapping of the efficiency of use of the storage site\'s compressors as a function of stresses and breakdowns.
ABOUT SIMON MIDY
As a Geoscientist Engineer with a strong foundation in petroleum-oriented disciplines, I…
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.