Michael Zarrella
- Role
- P E, Structural Task Manager at HDR
- Location
- New York, NY, US
- LinkedIn followers
- 500 followers
About Michael Zarrella
I work for HDR in the Manhattan, NY office as a Senior Structural Engineer with over 12…
Experience
P E, Structural Task Manager
Jan 2013 — Present
CONNECTING MIAMI I-395/SR 836/I-95 DESIGN BUILD PROJECT SCOPE: HDR is the EOR for the iconic Signature Bridge, a precast segmental 6 arch bridge which includes what will be the tallest arch in North America and 3rd largest in the world at 325 ft tall and 650 ft across. Project website: ROLE: Signature Bridge Design Coordinator (Jan 2019 - Present )- Coordinating design teams across the U.S. and Europe to deliver the construction documents for the Signature Bridge. NYCT ENHANCED STATION INITIATIVE PACKAGE 4 SCOPE: Provide state of the art enhancements to NYCT subway stations at Penn Station, 23rd St, 28rd St, and 57th St ROLE: Penn Station Design Station Manager (Feb 2018 – Jan 2019)- Managed the design for the NYCT subway control areas at Penn Station (34th St/7th Ave 1, 2, 3, lines and 34th St/8th Ave A, C, E lines) GORDIE HOWE INTERNATIONAL BRIDGE PROJECT PROPOSAL TEAM (non-selected bidder) SCOPE: Bridge crossing between Detroit and Windsor and point of entry border campuses ROLE: Design Coordinator (May 2017 – Feb 2018) PENNDOT RAPID BRIDGE REPLACEMENT PROJECT SCOPE: to replace 558 structurally deficient bridges in Pennsylvania. ROLE 1: Structural Designer (Oct 2015- Aug 2016)- Developed design plans for PS Spread Box Beam bridges and Culverts. ROLE 2: Area Manager (June 2015 - Oct. 2015; Aug 2016-May 2017)- Managed development of a Web App for team management, and oversaw bridge design teams across the U.S. MARIO M. CUOMO BRIDGE DESIGN BUILD SCOPE: Replace the Tappan Zee Bridge between Westchester and Rockland County with a 3.1 mile twin-span cable stayed bridge, and new state police and maintenance facilities for the NYSTA ROLE 1: Deputy Area Manager (Jan 2013 - June 2014)- Environmental Compliance, Visual Quality/Bridge Architecture, and Facility Design. ROLE 2: Structural Designer (June 2014 - June 2015)- Provided construction design support for over 2 miles of bridge approach span steel superstructure.
Skills
- Steel Design
- Business Communications
- Powerpoint
- Program Management
- Reinforced Concrete
- Seismic Design
- Structural Engineering
- Ls-Dyna
- Research
- Microsoft Office
- Staad
- Matlab
- Civil Engineering
- Cad
- Opensees
- Autocad
- Engineering
- Arcgis
Find verified contacts for anyone on LinkedIn
Unifers gives sales teams verified emails and direct dials, enriched profiles, and outreach that lands in the inbox.
Free plan included · No credit card required
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.