Martin Pidd
Senior Site Manager @Plug Me In
Signup · Get unlimited contacts
WORK HISTORY
Senior Site Manager @Plug Me In
City Of Kingston Upon Hull, GB
Responsible for setting up and delivering the whole Construction Site on behalf of our prestigious Client Associated British Ports UK (ABP) as Principal Contractor & Designer at their King Geroge Dock in the Port of Hull.Our remit is to design, build & install Photo Voltaic Solar Panels to the rooftops of 2 roofing sheds with a total capacity of 2,415kWp whilst operations continue within the building envelopes.Additionally, Plug me In are also responsible for the design, build and install of all electrical LV/HV works meeting the requirements of the DNO into ABP’s various Substation & interfaces in making sure landowners, local authorities, statutory undertakers are necessary to facilitate safe legal and timely completion of the works. All Civil Works will be included within Plug me In sub-contractor works for the various site trenching, ducting & concreting for connections to building arrays and Inverter siting.
EDUCATION
University of Linclonshire & Humberside
Level 2 HNC, Engineering (Mechanical/Manufacture)
Goole High School
6 GCSE O Levels in Maths, Physics, English, Handicraft, Technical Drawing & Geography
SKILLS
ABOUT MARTIN PIDD
A highly experienced Senior Site Construction, Project Engineering Manager with countless years of solid experience, with extensive Civil, Mechanical and Technical Engineering expertise, I am able to provide a very high-level engineering planning and control, commissioning of work to handover on time and budget.Results oriented and quality focused, building excellent working relationships with clients, suppliers and working with management teams to resolve issues.Main experience is in all levels of heavy industrial Construction Management over many years: Scope of Works, Environmental Policies, Introduction & updates to CDM & HSE criteria and policies, Hazops, Pipe Work, fabrication & welding, Isometric, G/A and P & ID Drawings, Hydro Testing, Test Pack Compilation, Infrastructure Preparation Schemes, Tendering & Analysis, Commissioning, appointment and management of contractors.Key achievements include: • Responsible for the Feasibility & Scheme Design Management process, procurement and installation, full Site Management as Principal Contractor of 2 Combined Heat & Power Generator & Steam Boilers at GlaxoSmithKline Ullverston & Ware RND & GMS Sites.• Full responsibility for leading Simon Storages site management team constructing 16 carbon steel storage tanks valued over £20.5m for major Petrochemical Companies.• Coordinated the tendering, procurement, site installation and commissioning of £20million Bio-Diesel Plant for Green Energy Bio Fuels.• Prepared programme planning for facility upgrades to encompass future £3 billion order levels for Gardner Aerospace• Responsible for the coordination and management of Health, Safety & Environment policies and also encompassing CDM Regulations for 5 key Thames Water Inner London Corridor sites.• Management and construction of a new CHP Engines systems at Lowerstoft WWTW for energy and heat deployment as well as Glaxo Smithkline in Ullverston, Cumbria & Ware in Hertfordshire.
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.