Liam Radigan

Director of Preconstruction @Gallo Construction Corporation

Albany, NY, US
EMAILS
l•••••••@gallogc.com
MOBILE NUMBERS
+91 *********19

Signup · Get unlimited contacts

WORK HISTORY

Nov 2024 — Present

Director of Preconstruction @Gallo Construction Corporation

View department →

Watervliet, NY, US

Herkimer WPCP Improvements:$7.5 million dollar water pollution control plant upgrade. Project includes full removal and replacement of the majority of the plant’s process mechanical equipment. Replacement of the mechanical bar screen, manual bar screen, raw influent pumps, blowers, aerated grit piping, and grit vortex unit at the headworks building. Replacement of the chain-and-flight clarifiers. Installation of new digester blower canopy and installation of new sludge pumps, blowers and aeration piping at aerobic digesters. Sequenced demolition of RAS and WAS piping and pumps. Replacement of belt filter press, polymer pump and associated piping at the dewatering building. Chemical feed skid improvements for effluent disinfection. Miscellaneous admin building architectural improvements.Stony Point STP Upgrades:$6.1 million dollar sewage treatment plant upgrade. Project includes deep excavation and shoring for the installation of a new headworks facility.~30\' cut required in wet soils, requiring interior braced sheetpiling along with intensive exterior dewatering. Project consists of over 500CY of cast-in-place concrete to construct new headworks, along with new influent pumps, slide gates, automatic bar screen, and grit vortex equipment. New CMU building over the top of the deep structure with a precast plank roof. Interior contains hundreds of feet of process piping, along with a new gas detection system and a full HVAC. Rome WRRF Improvements:$5.8 million dollar wastewater treatment plant upgrade. Project consists of ground improvements with grouted aggregate piers followed by installation of a glass-fused to steel Statewide Aquastore leachate tank. Other improvements includes of yard piping along with concrete rehabilitation, pump replacement, HVAC and piping improvements at the headworks facility. Difficult project requiring a long-duration bypass for the entire headworks improvement scope bypassing 100% of the plant\'s influent flows.

EDUCATION

2013 — 2014

Rio Salado College

Associate of General Studies

2014 — 2018

Arizona State University

Bachelor of Science - BS, Honors, Supply Chain Management

ABOUT LIAM RADIGAN

CliftonStrengths Assessment Results: 1. Strategic. Restorative. Individualization. Command. Relator.Myers-Briggs Personality Type: INTJ

This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.

Liam Radigan — Email, Phone Number & Contact Info | Unifers