Lee Britton

Technical Manager @Barratt London

London, GB
MOBILE NUMBERS
+91 *********19

Signup · Get unlimited contacts

WORK HISTORY

Jan 2022 — Present

Technical Manager @Barratt London

View department →

East London, ZA

EDUCATION

2006 — 2007

Havering College of Further & Higher Education

City & Guilds, AutoCAD (Computer Aided Design) 3D Level 3 Surfaces & Solids

2005 — 2006

Havering College of Further & Higher Education

City & Guilds, AutoCAD (Computer Aided Design) Level 3 2D

2008 — 2010

Havering College of Further and Higher Education

HNC, Construction

2005 — 2007

Havering College of Further & Higher Education

BTEC National Diploma, Construction & The Built Environment

SKILLS

SustainabilityProject PlanningRetailValue EngineeringAutocadMicrosoft OfficeSalesSocial HousingConstruction ManagementContract ManagementCost ManagementResidentialManagementProject ManagementRefurbishmentsDesign ManagementCadRefurbishingConstructionResidential HomesFeasibility StudiesProject Coordination

ABOUT LEE BRITTON

14 years in a Technical Co-ordination role; working for large private developers, a large housing association, and a principal contractors.Experienced in both new-build & refurbishment residential housing & regenerations schemes. I have managed & co-ordinated the technical aspects of simultaneous new build projects, varying in size with constraints such as-DLR/Network Rail/Crossrail: Proximity concerns were BAPAs and APAs required-Rail tunneling negotiations-Ground conditions such as; Gas/Asbestos/Chalk Aquifers-Ecological constraints such as; Great Crested Newts/Slow Worm & Field Mice translocation & working permits-Party wall awards-Planning-Building Control; NHBC & LABC-Sustainable energy options such as; District heating (gas, air source heat pumps, solar PV & thermal), fabric first construction-BREEAM: Design and post construction e.g. Shell and core for commerical units-Flood plains/sea defence bunds-Access constraints.I\'m focused on broadening my knowledge and developing my career within the industy, with focus on the design and management sector, and have delivered projects using the following construction methods-Brick & block-RC frame with SFS infill-Timber frame-Modular CLT-I am proficient with checking & interrogating drawings using various deviations of AutoCAD & NAVIS works Packages-I have experience with co-ordinating and managing large and small new build projects such as-The Lakes, Heybridge +300 units, private & social-Sutton Woods & Kings Acre, Maidstone +300 units, private & social-The Rodings Epping, 267 units, private & social-Kings Park Crawley, 80 units, private & social.As well as co-ordinating and managing award winning mixed new build and refurbishment & regeneration schemes developments, such as-Bow Cross (Crossways Estate) London, 500+ units, private & social-Oldchurch Park Romford, 326 units, private & social-Angel Way, Romford 74 units private & social-The Paragon, Ilford 141 units.+ 1 commerical unit-Cavandish Parade - 178 units.+ 1 commerical unit.

This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.