Kevin Barratt

Fabrication Manager, Marine Fabricators & Module Fabrication Facility @Irving Shipbuilding

Halifax, NS, CA
MOBILE NUMBERS
+91 *********19

Signup · Get unlimited contacts

WORK HISTORY

Nov 2022 — Present

Fabrication Manager, Marine Fabricators & Module Fabrication Facility @Irving Shipbuilding

View department →

Halifax, NS, CA

EDUCATION

1983 — 1988

Newcastle College

Naval Architecture and Marine Engineering

SKILLS

OffshoreEngineeringFeedLngSteel StructuresConstructionOilMarine EngineeringGasCalculationsPetrochemicalEngineering DesignLiquefied Natural Gas (Lng)AutocadDetail DesignFpsoPetroleumOilOffshore DrillingSubsea EngineeringPipingProject EngineeringEnergy3dInspectionMetal FabricationPressure VesselsDesign EngineeringNaval ArchitectureInventorStructural EngineeringCadEpcFloating Production, Storage and Offloading (Fpso)MaritimeStructural AnalysisFabricationMechanical EngineeringShipbuilding

ABOUT KEVIN BARRATT

RECENT ACTIVITIES Aug 2016 - Present Irving Shipbuilding Inc, Halifax, NS, Canada Field Engineering Manager (Formerly in Planning / Engineering / CSC Project) June 2013 - Aug 2016 Babcock Integrated Technology (Marine Division) Site Representative – Petrofac FPF1 Project (July 14 – Present) Site Structural Field Engineer / Construction Co-ordinator for Topsides & Marine scope. Coordinating all construction Engineering modifications & new scope from engineering through to fabrication & erection.(Feb 14 – July 14) Structural Lead for Topsides & Marine Scope checking workshop drawings & focal point for all engineering queries. Coordinating works within site Structural Engineering Department.(Jun 13 – Feb 14) Site Representative for Babcock overseeing installation of Sponson Structure. Checking Shipyard workshop drawings for compliance with design, technical focal point for all queries relevant to Babcock design within Marine Scope. July 2008 – June 2013 Babcock Integrated Technology (Marine Division)(Formerly Armstrong Technology Associates) Structural Engineer Responsible for producing steelwork scantling calculations and drawings for various projects including Shell LNG Carrier, OSV FPSO Conversion, Seawater Desalination Vessel, CVF, MOD Ammo Barge, Shell Bonga Gangway Landing Platform, Petrofac FPSO Conversion & AWS Wave Energy Barge. Scantlings included Topside support stool structure, ER Pump seats, Main Deck plating-in in way of hatch removal, additional Superstructures, Deckhouses and Diesel Generator seats, seat calculations & analysis.

This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.

Kevin Barratt — Fabrication Manager, Marine Fabricators & Module Fabrication Facility at Irving Shipbuilding in Halifax, NS, CA | Unifers