Kenny MacLeod
Project Performance Lead @Neptune Energy
Signup · Get unlimited contacts
WORK HISTORY
Project Performance Lead @Neptune Energy
Aberdeen, GB
EDUCATION
Lewis Castle school / college
Engineering , Fabrication and welding
ABOUT KENNY MACLEOD
December 21 / Present Neptune Energy Project Performance Lead. Seconded to BP management team to support delivery of Seagull Sub Sea tie back project to BP ETAP. July 21 / November 21 Three60 Energy Offshore Project Co-ordination. Contracted to Repsol Sinopec as projects coordinator / client rep for ED & C activities associated with decommissioning of Tartan Alpha. Managing all offshore contractors and providing support an input into details design, associated engineering, providing support and interface with operations team to safely take the asset to NNA (Normally Not Attended) status. February 21 to May 21 GLOBAL E&C Bid lead. Developing of bid proposals and PEP for fabrication, offshore construction, and commissioning projects. Supporting and advising corporate management team for development of tender and submission strategy. Ithaca Energy UK Ltd July 18 / December 20 Construction and Commissioning Manager. Vorlich sub sea tie back to FPF-1. Responsible for fabrication, installation and hook-up of new NGL module and all associated topside brown field construction and commissioning. Repsol Sinopec UK ( Formally Talisman) 2016 to July 18. Engineering Coordinator D & TA ( Decommissioning and Transition Assets) Responsible for delivery of engineering and modifications on Fulmar, Auk and Saltire platforms. Management of engineering contractors for delivery of detail design, fabrications, procurement, associated planning and offshore implementation. 20••••16 Shut Down Execution Focal Point, Montrose area redevelopment (MONARB) Formed part of delivery team for delivery of MONARB 2016 shut down 20••••15, Construction Manager. Arbroath topside modification, management of detailed design contractor for delivery of top side repairs and modifications. Buchan “A” off station topside preparatory works for riser disconnect. Support to Tartan “A” operations team to deliver topside construction works required for startup after extended shut down. Study works Bleo Holm FPSO off station / hand back project. 20••••13, Site Construction Manager; Green field construction 1500Te gas compression module for Claymore CCU Project, Constructed Schiedam Netherlands. 20••••10, Top side Construction Manager; Auk North subsea tie back to Fulmar A. 20••••09, Offshore project co-ordinator & Construction Engineer; Various projects UK North sea. Wood Group Engineering 19••••06, Construction superintendent, Shut down Co-ordinator, & Construction Engineer; Various projects on and offshore UK & Netherlands.
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.