Joseph Seamons
- Role
- Professional Mining Engineer at Arrowhead Underground Llc
- Location
- Reno, NV, US
- LinkedIn followers
- 500 followers
About Joseph Seamons
Diligent professional mining engineer with 10+ years of experience and a proven knowledge…
Experience
Professional Mining Engineer
Jan 2021 — Present
Recent project highlights include the following: •Chaquicocha Underground Project, Peru. Produced a detailed trade-off study between two different stoping orientations highlighting a path forward. Created the designs, schedule, and engineering report for the Newmont Stage 3 work. Built several mine plans to evaluate dewatering options. •Subika Underground, Ghana. Built and evaluated several mine plans in Deswik including, long hole open stoping, long hole stoping with fill, and modified sub level caving. The modified sub level caving was selected as the preferred mining method. Improved the modified sublevel caving mine plan to advance the mine plan through the stage gate process to receive acceptance and funding. Provided training to the site engineers. •Tanami Underground, Australia. Designed and evaluated a sublevel shrinkage mine plan in Deswik, resulting in substantial improvements over the current long hole stoping mine plan. Conducted a comprehensive comparison between the two plans, demonstrating that the sub-level shrinkage mine plan led to higher NPV, lower costs, increased production, and reduced risk. Achieved significant cost savings and operational efficiency by reducing backfill expenses and eliminating the need to skip waste through the shaft. Led the design and creation of each level, including the creation of a caving simulation model. Collaborated with multiple stakeholders, including Newmont Corporate, on-site engineers, Australian consultants, and other consulting engineers, to ensure a comprehensive approach. •San Albino Underground Project, Nicaragua. Developed multiple underground cut and fill mining plans. Played pivotal role in facilitating shift from open-pit to underground operations. Determined optimal cut-off grades and constructed detailed grade-tonnage curves through proficient utilization of the Deswik Stope Optimizer.
Education
University of Utah
Bachelor of Science (B.S.), Mining Engineering
2007 — 2011
Find verified contacts for anyone on LinkedIn
Unifers gives sales teams verified emails and direct dials, enriched profiles, and outreach that lands in the inbox.
Free plan included · No credit card required
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.