Jose Torres
Project Manager @Nicholson Construction
Signup · Get unlimited contacts
WORK HISTORY
Project Manager @Nicholson Construction
Red Bluff Dam (TX)- installation of a remedial grout curtain for the existing embankment dam Chimney Hollow Reservoir (CO)- installation of an upstream/downstream grout curtain using high mobility grouting for the new reservoir Boone Dam (TN)- exploratory and remedial grouting program using high mobility and low mobility grouting of the existing embankment. Installation of a cut off wall using reverse circulation drilling techniques. Norris Cut Tunnel (FL)- construction of a TBM retrieval shaft on Fisher Island (Miami) using deep soil mixing Deep Rock Tunnel Connector (IN)- project engineer for the installation of 3\'-0\" thick reinforced concrete circular diaphragm wall to build two deep shafts with diameters of 44\' and 23\'. OARS (Phase 2) Chemical Grouting (OH)- Installation of tube-a-manchettes in horizontally drilled locations for the injection of chemical grout for support of excavation Front Street Lofts (CT)- Installation of 164 micropiles for loft apartments foundation. Wolf Creek Nuclear Power Plant (KS)- installation of secant/tangent piles for support of excavation in three areas. Drilled tangent/secant piles off of barges for the installation of an embankment near sensitive structures. San Francisco Central Subway (CA)- construction of a diaphragm wall built for the launch shaft at SFMTA\'s Central Subway Project, and two headwalls built near the Moscone Center. MTA 2nd Avenue Subway (NY)- construction of diaphragm wall & jet grouting at the 96th Street station
ABOUT JOSE TORRES
Experienced Project Manager with a demonstrated history of working in the construction…
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.