Jitendra Kumar Yadav
Inspector Track work\'s\" at MAHSR-(T2 PKG) High Speed Rail (Bullet Train Project) Surat,Gujarat
- Role
- Senior Engineer (Inspector Track) at Nippon Koei India Private Limited
- Location
- Agra, IN
- LinkedIn followers
- 500 followers
About Jitendra Kumar Yadav
Planning & Execution of Slab Track Laying, CAM Injection and inject, CAM Testing…
Experience
Senior Engineer (Inspector Track)
Nippon Koei India Private Limited
Nov 2023 — Present · Surat, IN
Mumbai – Ahmedabad High-Speed Rail (MAHSR Bullet Train) project is a 508.17 km under construction High Speed Rail line that will connect Mumbai, Maharashtra with Ahmedabad, Gujarat through 12 stations at an estimated cost of Rs. 1.1 lakh crore (US$15 billion)1. Inspection of RC Bed and Anchor.2. Inspection of Slab Track Installation,3. Inspection of CAM Injection ( CAM Injection on the Track Slab adjustments to the track laying ( Motor car, CAM Injection car, carriage wagon)4. Track Slab Receiving Inspection, Track Slab Loading/Unloading, Track Slab Installation Preparation.5. Rail type must be JIS 60 kg and 52 kg rails.(Length of rail 25 metre)6. Inspection of Crack and defects work.7. Inspection of Temporary Track work 8. Inspection of flash butt welding. Collection of Reports of machineries & weekly materials report of store.
Find verified contacts for anyone on LinkedIn
Unifers gives sales teams verified emails and direct dials, enriched profiles, and outreach that lands in the inbox.
Free plan included · No credit card required
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.