Jared Trowbridge
Project Manager @DOWL
Signup · Get unlimited contacts
WORK HISTORY
Project Manager @DOWL
I-405 Fremont Bridge Approach Ramps - Assistant PM and design lead for the replacement of 22 modular and strip seal joints, 6 joint repairs, PPC deck overlays and structural deck overlays.I-105 - Assistant PM and design lead for the rehabilitation of 7 bridges on I-105 and its associated ramps between the Delta Highway Interchange and downtown Eugene. Repairs include deck overlays, seismic retro fits, deck overhang strengthening and bridge rail replacements.Bridge Street Bridge Painting and Deck Replacement (Lane County)- Project Manager for the rehabilitation of a steel truss bridge over the McKenzie River. The project includes painting the steel truss, adding shear studs to the stringers, deck replacement and new bridge rail.OR569 SCS Canal & UPRR Bridge Repair - Assistant PM and design lead for the rehabilitation of the OR 569 bridge over the SCS Canal and UPPR in Eugene, OR. The project includes a bridge deck overlay, new bridge joints, new bridge rail, deck strengthening and seismic retrofits.Managed numerous load rating contracts for ODOT, Washington County, Skamania County and other clients. Certified Bridge Safety Inspector in Oregon and Washington.Registered Engineer in Oregon, Washington and California.
EDUCATION
Oregon State University
Master of Engineering
Oregon State University
B.S.
SKILLS
ABOUT JARED TROWBRIDGE
Project Manager at DOWL
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.