Harvey Byres

Lead Planner @Lendlease

Newcastle Upon Tyne, GB
MOBILE NUMBERS
+91 *********19

Signup · Get unlimited contacts

WORK HISTORY

Oct 2023 — Present

Lead Planner @Lendlease

View department →

Gateshead, GB

EDUCATION

2001 — 2005

Northumbria University

B.Sc (hons), Building Design Management

SKILLS

CommunicationConstruction SafetyRefurbishment ConstructionDesign / ProcurementConstructabilityAsta PowerprojectDesign ManagementPrimavera P6Project ManagementMs ProjectCreative Problem SolvingPre-ConstructionNew Build ConstructionCritical Path AnalysisAsbestos RemovalCommercial ManagementChallenge DrivenVariety of Construction ExperiencePositive Team PlayerTender Preparation

ABOUT HARVEY BYRES

Group Planning Manager demonstrating the following skills and experiences-Experience in the following construction sectors-• Healthcare, Education, Higher Education, Defence, Leisure, Mixed Use, Residential (inc. high rise, PRS & Student Accommodation), Commercial (inc. high rise), Industrial, Retail and RailFully proficient in the following project management software-• Primavera P6 (completion of Oracle advanced project management course), Synchro Pro 4D Planning Software (completion of advanced PRO training), Asta Power project and Microsoft ProjectExtensive tendering experience, analysing information and preparing documentation for key project submissions, ensuring key risks / opportunities are mitigated / identified through optimal construction methods and techniques.Production of planning documentation including-• In-depth construction programmes - fully logic linked identifying the critical path, float, cost loaded and resource allocation (including resource histograms).• In-depth contract programmes highlighting key aspects of the contract, ensuring any potential risks are identified and mitigated.• NEC Clause 31 & Clause 32 compliant programmes• Building model linked back to the construction programme using Synchro Pro• 2D & 3D logistics plans using Synchro Pro • Information required and procurement schedules fully integrated into the construction programme, ensuring design / procurement does not impact the onsite project delivery.• Programme progress updates, utilising baselines and as built information including S curve analysis.• 2D & 3D phasing drawings, providing additional backup / clarification• Effective delay analysis - preparation and defence of claim submissionsVast experience for both new build and refurbishment projects, including extensive knowledge and experience within the removal of asbestos. Construction experience under the following contacts:• JCT, NEC, Design and Build, PFI, Traditional and Construction Management

This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.

Harvey Byres — Lead Planner at Lendlease in Newcastle Upon Tyne, GB | Unifers