Fernando Vargas

Sr Production Operations Technician @Apache Corporation

Midland, TX, US
MOBILE NUMBERS
+91 *********19

Signup · Get unlimited contacts

WORK HISTORY

Feb 2023 — Present

Sr Production Operations Technician @Apache Corporation

View department →

Optimization of production, equipment efficiency, and cost. Set optimal gas injection rates on both gas lift and gas assisted plunger lift wells to maintain critical velocity to lift production to surface from injection point downhole. Also optimized Rod Pump wells by shooting fluid levels, creating rod designs using Rodstar, adjustments of set points on Pump Off Controllers, and monitoring both Surface and Downhole cards. Look over ESP’s as well. Trend temperatures, Hz, and pump intake pressures. Review well test and make adjustments accordingly to optimize Wells. When required to do so, Supervised Workover Rigs/ Pulling units (PESI CERTIFICATION) on both vertical and horizontal wells. Worked failures, clean outs on both vertical and horizontal wells, New completions, and occasionally water injection wells.

This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.