Eric Schultz
Project Director @C.W. Driver Companies
Signup · Get unlimited contacts
WORK HISTORY
Project Director @C.W. Driver Companies
San Diego Operations
EDUCATION
University of Wisconsin-Madison
B.S., Civil Engineering - Construction Engineering & Management
SKILLS
ABOUT ERIC SCHULTZ
Experienced construction management professional in OSHPD healthcare, power, industrial, water treatment, civic, higher education, K-12 education and retail sectors. Successfully managed numerous construction projects across public and private sectors with contract values totaling over $500 million from Wisconsin, Missouri and South Dakota to California. Focused on improving industry processes and mentoring junior construction professionals. Project delivery methods include design build, engineering/procurement/construction, integrated lean project delivery, CM at risk, design bid build, lease-lease back.Project Experience Highlights:• CSU San Marcos Integrated Science & Engineering - San Marcos, CACollaborative Design Build, LEED Gold (2024 - present)$110MM• San Diego Unified School DistrictLease-Leaseback, Whole Site Modernizations$100MM+ in project contracts (2020 - present)• Pratt & Whitney - Carlsbad, CADesign Build, Phase 1 - 3 contracts (20••••21)• County of San Diego ARCC East County Office & Archives - Santee, CACompetitive Design Build, Zero Net Energy, LEED Gold (20••••19)$19MM• El Cajon Animal Shelter - El Cajon, CAProgressive Design Build, LEED equivalent (20••••18)$10MM• Five Lagunas - Laguna Hills, CALaguna Hills Mall renovation (2016)$80MM• San Diego County Health Services Complex - San Diego, CADesign Build (2016)<$1MM• Mesa College Fine Arts Building - San Diego, CADesign Build, LEED Silver (2016)$2MM• MedImpact Bldg #1 - Scripps Ranch, CAFire Suppression System Repairs (2016)<$1MM• Sharp Grossmont Hospital - La Mesa, CAInterim South Loading Dock & Level B Seismic Upgrades (20••••14)East Tower Renovation & Infrastructure Upgrades (20••••15)$6MM and $26MM• Orange County Water District – Fountain Valley, CAAdvanced Water Purification Facility Expansion to 100 MGD (20••••13)$150MM• Basin Electric Power Cooperative – Elkton, SDDeer Creek Station Unit 1 – New 300 MW Natural Gas Combined-Cycle Generation Facility (20••••12)$405MM• City Utilities of Springfield – Springfield, MOJohn Twitty Energy Center Unit 2 – New 300 Megawatt Coal Fired Boiler (20••••10)New Air Quality Control / Backend System (2008 - Lawrence University Warch Campus Center – Appleton, WINew sq. ft. LEED Gold certified Campus Center (20••••08)New Lawe Street Landbridge (20••••08)Sage Hall Dormitory Lower Level Renovation (2007 -
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.