Dnyaneshwar Bagal
Process Engineer @Vapco Engineers Private Limited
Signup · Get unlimited contacts
WORK HISTORY
Process Engineer @Vapco Engineers Private Limited
Navi Mumbai, IN
Project: 125 KLPD Modification of existing Molasses Plant to Grain Based Ethanol Plant. • Check battery limits, line sizing, Plate Heat exchanger Calculation, PSV Calculation, Pump Calculation, Heat and Material Balance Steam Consumption Calculation. Project : 300 KLPD Grain Based Absolute Alcohol Plant 1. Design & Drawing verification• According to Technical offer Generating PFD, P & ID, Equipment list, Line Sizing, Equipment’sSizing, Tanks Sizing.Design Calculation of cooling tower capacity, PSV, flame arrester, Heat Exchanger,Evaporator, Distillation columnGiving input to Droughting, Fabrication, Static & rotary Design team, Instrumentation, civil Department’s.2. Project Management & Co-ordination-Site activities, Material supply and Manpower supply by taking daily progress reports fromsite. Co-ordination with client, vendors, sub-contractors to execute the project as perschedule. Understanding the scope of project from order indent.Software Used:AutoCAD, Plant 3D, Aspen Hysys, DWSIM,
EDUCATION
PVPPCOE | Padmabhushan Vasantdada Patil College of Engineering
B.Tech Chemical Engineering
ABOUT DNYANESHWAR BAGAL
Process Engineer with 3+ years of experience in EPC Projects. Proficient in Equipment…
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.