Dan Jones

Senior Signalling Project Engineer @Volkerrail Ltd

Doncaster, GB
MOBILE NUMBERS
+91 *********19

Signup · Get unlimited contacts

WORK HISTORY

Jan 2011 — Present

Senior Signalling Project Engineer @Volkerrail Ltd

View department →

EDUCATION

2015 — 2017

Sheffield Hallam University

BEng Railway Engineering

2008 — 2010

Sheffield Hallam University

FdEng Railway Engineering

ABOUT DAN JONES

Current role as a Senior Signalling Project Engineer/ CEM/ CRE-C responsible for delivery of signalling/ multidiscipline projects. Production and Approval of safety documention ensuring compliance with CDM and CSM regulations. Liaison with design, installation, test teams and project planners to deliver works, production and submission of Technical Queries, review and approval of staff competencies and ATW, attendance of IDC meetings to ensure compliance and compatibility with other disciplines, input into and production of project / hour by hour programmes, production of scope documentation for subcontractors, management of internal resource and subcontractors, tendering projects acting as engineering lead on multidisciplinary projects including production of delivery programmes and methodologies. Projects experience - Tranche 7 Level Crossings (GRIP 5 - 8), Nexus Metro 39 point end renewals (GRIP 5 - 8), White Rose Bridge Doncaster ECML cable diversions, Doncaster IEP depot ECML cable diversions, Temple Mills Signal alterations, CRE-C Lea Bridge platform extensions (GRIP 6 - 8), CRE-C Blackwater Signal Relocation (GRIP 2 - 8), CRE-C Ufton Nervet LC Decommissioning (GRIP 4 - 8), CRE-C Bamber Bridge Life Extension (GRIP 3), CRE-C WAML Capacity Improvements (GRIP 6 - 8), CRE-C Hunts Cross Life Extension (GRIP 3), CRE-C Hunts Cross Gantry renewal (GRIP 2 - 3), CRE-C Bardon Quarry Level Crossing Upgrade to TMOB (GRIP 2 - 5), CEM/ CRE-C Chevington SSI Data Works (GRIP 5 - 8), CEM/ CRE-C Carnforth Signal renewal (GRIP 3 - 5), Sig PE Nexus EBI400 track circuit conversion (GRIP 6 - 8), CRE-C Portsmouth LC Flex system (GRIP 5 - 8). CRE-C Castleford Diversionary Routes project (GRIP 5 - 8), CRE-C Chilterns ATP recovery and TPWS install (GRIP 5 - 8). CEM - Bradford Forster Square Platform 0 Capacity Enhancements (ES4 - 8), CRE-C DP World Sidings Remodelling Phase1 / 1A

This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.

Dan Jones — Senior Signalling Project Engineer at Volkerrail Ltd in Doncaster, GB | Unifers