Christian B Galvin
Bridge EIT at HDR
- Role
- Bridge Eit at HDR
- Location
- Austin, TX, US
- LinkedIn followers
- 500 followers
About Christian B Galvin
Structural Bridge EIT for Cable Stayed and Local projects
Experience
Bridge Eit
Nov 2024 — Present · Austin, TX, US
Design and develop bridge calculations and drawings for Cable Stayed and TxDOT bridges. Projects include- Earthquake Ready Burnside Bridge; Portland, Oregon - Vehicular and MUP floorbeam and deck design on cable stayed bridge- Delaware River Bridge; Major river crossing over Delaware River between Pennsylvania and New Jersey - Vehicular floorbeam and deck design on cable stayed bridge- Rio Grande Gorge Bridge; Major river crossing over Rio Grande River, New Mexico - Construction loading analysis on steel truss deck arch bridge- Pelican Island Bridge; Causeway bridge between Galveston and Pelican Island, Texas - Load rating of single leaf bascule span- Port of New Orleans E. St. Bernard Bridge; Vehicular bridge over RR, Louisiana - Independent check of three span horizontally curved steel bridge
Education
Palos Verdes High School
High School Diploma
2014 — 2018
The University of Texas at Austin
Bachelor of Science - BS, Civil Engineering concentrating in Structures
2018 — 2021
The University of Texas at Austin
Master of Science - MS, Civil Engineering concentrating in Structures
Find verified contacts for anyone on LinkedIn
Unifers gives sales teams verified emails and direct dials, enriched profiles, and outreach that lands in the inbox.
Free plan included · No credit card required
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.