Charlie Haas

Architectural Designer @Integrated Design Solutions

Auburn Hills, MI, US
MOBILE NUMBERS
+12•••••••94

Signup · Get unlimited contacts

WORK HISTORY

Feb 2013 — Present

Architectural Designer @Integrated Design Solutions

View department →

Troy, MI, US

Various projects at the University of Michigan Hospitals and Health Centers-University of Michigan School of Music, Theatre and Dance Building Renovation and Brehm Pavilion Construction Documents and LEED Submission-Grand Rapids Community College Main Building Renovation Phase II-Mercy High School Air Conditioning Replacement-Bedrock Real Estate Services 620/630 Core Renovation-South Lyon Community Schools 2015 Bond - Renovation and Site Athletics-University of Notre Dame Football Stadium Renovations to Home and Visitor Locker Rooms and Tunnel Area-Various projects for Utica Community Schools-New Romeo High School/RETC Renovation-Utica Community Schools Stevenson High School MADE Academy Renovation-Mott Community College Family Life Center and Early Childhood Learning Center (former Woodside Church)-Mott Community College Southern Lakes Branch Center Renovation and Rehabilitation

EDUCATION

2005 — 2010

University of Detroit Mercy

Masters

2001 — 2005

Brother Rice High School

High School

ABOUT CHARLIE HAAS

LEED AP BD+C, Architectural Designer at Integrated Design Solutions

This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.