Oct 2018 — Present

Project Superintendent Quality Control Manager Site Safety and Health Officer @APC Construction, LLC

View department →

W912P8-18-C-0043 PCCP Additional Work The work consisted of trimming the rubber seals at the corners of the closure gates; adding an alternative clean agent fire suppression system and modifying the existing wet pipe sprinkler in the SCADA room of the auxiliary buildings; automating the louver dampers on the south side of the generator buildings; and construction of chain link fencing. This work was performed at all three pump station sites – 17th Street Canal, Orleans Avenue and London Avenue. Modifications included automation of louver switches, replacement of data loggers, removal of work platforms on all overhead cranes, rehab of AC units at Sewerage and Waterboard Pump Stations 3 and 7 and installation of lifeline systems on the fuel tanks. W912P8-19-C-0053 Wheeler Warehouse The work consisted of construction of a warehouse on the New Orleans District Reservation, including driving steel H-pile, concrete placement, metal building installation, fire sprinkler system, louvers and ventilation, interior distribution system, lighting and electrical work, water utility piping, mechanical room buildout, and asphaltic pavement installation. N69•••19-D-0123 DSFP Facilities Fuel Wharf 128 Repairs Replacing deteriorated wooding members of an existing fuel wharf with treated wooden members. These members include primary support including piles, bracing beams and decking. 2.Renovations to the wharf\'s fire suppression system. The existing hydraulic gangway access \'brow\' will be removed and replaced \'like-in-kind\'. 3.Removing two oil boom reels and installing government furnished oils boom reels. 4.Improving the concrete block support building with removal of equipment, installation of new doors and windows, patching holes in the floors and roof, strengthening of wall, installation of a new roof and the installation of a new access walkway/stairs. 5.Demolishing the existing fire suppression pumps and generators in building and incidental related work.

SKILLS

Cellular CommunicationsProduct ManagementNetwork DesignEngineeringTeam LeadershipCablingFttxInternet ServicesTransmissionProject PlanningTeam BuildingOperations ManagementAcadPersonnel ManagementSdhCablesBroadbandEthernetBudgetsProgram ManagementNetworkingContract NegotiationMs ProjectTelephonyMicrosoft ExcelManagementTelecommunications EngineeringProject ManagementConstructionOutside PlantOsp EngineeringTelecommunicationsComputer Network OperationsFiber OpticsVendor ManagementWimaxOptical FiberTelecommunication ServicesVoipOsp

ABOUT CHARLES GUIDRY

Specialties: Operational Management Personnel Management Contract…

This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.