Bradford Blomquist
Field Supervisor at Parsons Electric An Archkey Company
- Role
- Field Leader (Gf, Gfic & Project Superintendent) at Archkey Solutions Parsons Electric
- Location
- Minneapolis, MN, US
- LinkedIn followers
- 500 followers
About Bradford Blomquist
Brad has been in the electrical construction industry working full time for over 45 years with a majority of those years as a supervisor in charge of electrical construction. He has completed many mission critical projects. His knowledge and implementation of the key technical installation requirements of mission critical facilities is not easily duplicated. SPECIALTIES: New \"Green Field\" Data Centers Data Center Live Upgrades & Life Cycling of equipment Mission Critical Construction MISSION CRITICAL PROJECTS: Project \"Bigfoot\" in Rosemount, MN 160MW Data Center Campus Confidential Client Data Center Project \"Grey Wolf\" 8MW Generation, Pocatello, ID Confidential Client (IAD) 120 Data Center 30MW Buildout, Sterling, VA Fortune 500 Retailer, TTC (2) KVA UPS Life Cycle Replacements W/New Feeders, Input & Output Swbds, Tier 3 Fortune 500 Retailer TTCE New Critical A/B Ties,(3) 3250 KVA UPS Life Cycle Replacements W/New Liquid Cooled Substation Transformers, feeders, Input & Output Swbds, Tier 3 Stream Cofferdam Data Center 54K SF new construction with 20K of RF, 9.4 MW of generation & 4.84 MVA of UPS W/build out for Confidential client, Tier 3 Plymouth Tech Center (PTC), 5 Level Bldg, 30K SF RF Upgrade, Live Upgrade to Tier 3 Confidential Client Data Center in Pryor Creek, OK Large New Data Center for Nat Tech Comp 50 MW of MV Generation. Stream Private Data Center of MN Colo Site, Base Building and, 10K SF Tier 3 RF Day 1, 20K SF RF build out of Data Halls 2 & 3 (2) years later “Next Tech Center 1” Expansion - 49K SF Expan to Data Cntr, 28K SF of RF Live Add/Upgrade, Tier 3 “Next Tech Center 2”- 253K SF Concurrently Maintainable Data Cntr 84K SF of RF, 27.5 MW, MV Distribution/Generation, Tier 3 “Next Tech Center I”- 189K SF Concurrently Maintainable Data Cntr 64K SF of RF, 20 MW, MV distribution/Generation, Tier 3 Confidential Health Insurance Company Data Center-Live Upgrade 2.5K SF of RF Tier 3, Tier 3 Fortune 500, National Retailer (TTCE) 161K SF Mission Crit Data Center, 16 MW MV Distribution/Generation, Tier 3 Fortune 500 National Retailer (TTC)(2) Mech & Elec Live Upgrades Tier 3 Fortune 500 Bank Data Center Mech & Elec Live Upgrade Tier 4 OTHER PROJECT EXPERIANCE: Shakopee, MN utility (MMPA) 48 MW \"Peaker\" utility power generator plant Target North Campus: 2 New 8 story 700K SF Office Towers with building remodeling and extensive site work. Calhoun Sq Mall: Major Mall Remodel/Add Oracle Corp ADC Telecom Man. Facilities: 350K SF Re-stack & 499K SF New Const Chaska High School Mall of America - Camp Snoopy (Log Flume)
Experience
Field Leader (Gf, Gfic & Project Superintendent)
Archkey Solutions Parsons Electric
May 2000 — Present · Minneapolis, MN, US
Education
Dunwoody College of Technology
Diploma
E.J. Cooper High School, New Hope, MN
High School Diploma
Find verified contacts for anyone on LinkedIn
Unifers gives sales teams verified emails and direct dials, enriched profiles, and outreach that lands in the inbox.
Free plan included · No credit card required
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.