Andy Gray Aciro
Senior Strategic Rail Operations Planner @GHD
Signup · Get unlimited contacts
WORK HISTORY
Senior Strategic Rail Operations Planner @GHD
London, GB
Supporting a growing portfolio of work in the Transports strategy and Planning Team providing a range of timetabling support to on going projects with the Department for Transport (DfT) and other client including train operating companies worldwide. Rail Operations Technical Advisor - Siemens/Networkrail UK – 2020 Initial review and assessment of the status of the East Coast Main Line’s ETCS signalling installation between London Kings Cross and Grantham using TPS and RailSys models, producing a working timetable for in accordance with the 2021 ITSS. Rail Operations Advisor & Timetable Planner - TRUe/Networkrail UK 2019 Reviewed of the current and future operational timetable paths in the Leeds station area and assessing ECS requirements to and from Neville Hill Depot for the proposed Neville Hill Upgrade programme (TRUe/Network Rail). Rail Operations Advisor - Public Transport Victoria - 2019 Public Transport Victoria (PTV) have committed to improving train service frequency and performance on the route between Melbourne and Warrnambool, specifically the improvement of the single line sections between Waurn Ponds and Warrnambool. Rail Operations Modelling & Technical Advisor - River City Alliance, Queensland - 2018 Based in Brisbane, providing Op Modelling experience for the CRR project, including timetable compatibility with the Project Scope and Technical Requirements (PSTR), involving planning the future timetable taking into account rail upgrades and timetable changes on interfacing lines, as well as the desired improvement of service delivery on the core study route. Rail Operations Advisor and Timetable Planner - Public Transport Victoria 2017 to 2018 Improving train service frequency and performance on the rail line between Melbourne and Warrnambool, with specific improvement to the commuter services between Melbourne and Waurn Ponds including track duplication, new station platforms, upgraded signalling over a 12km section of track.
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.