Ammar Nisar
Section Engineer @Eiffage Kier Ferrovial BAM (EKFB)
Signup · Get unlimited contacts
WORK HISTORY
Section Engineer @Eiffage Kier Ferrovial BAM (EKFB)
Brackley, GB
Key Highlights:• Leading earthworks delivery across a 4 km section, including major excavation at Turweston Cutting 1.855 million m³ and spent £38M. • Westbury Embankment spent £3.2M and 49,489.3m3 material placed Class 9(9J1 & Surcharge).• Turweston Embankment spent £4.5M and 21,2017m3 material placed Class 9(9J1 & Surcharge).• Helmdon Embankment spent £2M and 52,174.2m3 material placed Class 9(9J1 & Surcharge)• Grovehill Embankment spent £1.4M and material placed Class 9(9J1 & Surcharge).• Built up landscape bunds using 927.6K m³ material dug out from Cutting. • While doing all this work kept Quality and H&S as a main priority.• Signed TBSs for subcontractors. • Led coordination meeting with all teams working on project. • Led weekly meetings with site team. • I was responsible for creation of 3 months look ahead and 3 week look ahead too. • I managed the deliveries material to other sections. • I managed the crushing activities of 1A1 material. • Managing subcontractors, ensuring programme adherence, quality compliance, and safe execution of works. • Overseeing material logistics (aggregates, geotextiles, engineered fill) and implementing quality assurance through ITPs and testing (CBR, moisture, density). • Coordinating with design and survey teams for setting out, volume calculations, and resolving technical queries. • Driving health, safety, and environmental compliance, including toolbox talks and CDM adherence. • Utilizing digital tools (CAD, GPS, earthworks management systems) for accurate setting out and real-time progress tracking.
ABOUT AMMAR NISAR
A dynamic, highly knowledgeable and committed professional, educated to BSc Civil…
This profile is compiled from publicly available professional sources. Unifers is not affiliated with or endorsed by LinkedIn. Request removal of this profile.